Cultural

ARTS

Art Gallery of Peterborough
Feasibility Study, Peterborough, ON | 2014 (w. Lundholm Associates)

Belleville Archives
Feasibility Study, Belleville, ON | 2012

Canoe Museum
Feasibility Study, Peterborough, ON | 2000

Lakefield College School Bryan Jones Theatre
Lakefield, ON | $3M | 2004

Mady Centre for the Performing Arts
Barrie, ON | $5.5m | 2011

Market Hall Performing Arts Centre
Peterborough, ON | $9m | 2011 (w. Trevelyan Architect)

Peterborough Museum and Archives
Peterborough, ON | $3.5m | 2014

Shaw Festival Production Centre
Niagara-on-the-Lake, ON | $14m | 2004

Shaw Festival Royal George Theatre Renovations
Niagara-on-the-Lake, ON, $500k | 2009

Shaw Festival Theatre
Concept Design, Niagara-on-the-Lake | 2011

Showplace Peterborough Performing Arts Centre
Peterborough, ON | $1.5m | 1998

Trent University Bagnani Hall
Peterborough, ON, $1m | 2009

Wilfrid Laurier University Faculty of Music
Concept Design Study, Waterloo, ON | 2014 (w. John MacDonald Architect)

Young Peoples Theatre
Concept Design Study, Toronto, ON | 2012

RECREATION

Bradford West-Gwillimbury Leisure Centre
Bradford, ON | $38m | 2011 | LEED Silver (w. Salter Pilon Arch)

Camp Kandalore Master Plan
Dorset, ON | 2013

McDonnel St. Activity Centre
Peterborough, ON | $2.5m | 2011

Onondaga Camp Dining Hall
Minden, ON | $1.5m | 2003

Peterborough Events Centre
P
eterborough, ON

Peterborough Millenium Pavilion
Peterborough, ON | $600k | 2000

Richmond Hill Sports Field House
Richmond Hill, ON, $3.5m | 2016 (w. AECOM)

Riverview Park and Zoo Splashpad and Pavilion
Peterborough, ON | $400k | 2005

Riverview Park and Zoo Welcome and Education Centre
Peterborough, ON | $500k | 2015

Sharbot Lake Trailhead Facility
Master Plan, Sharbot Lake, ON | 2012 (w. Basterfield & Associates)

Trent Hills Sports Field House
Hastings, ON, $3.5m | 2015 (w. AECOM)

Trent University Athletics Master Plan
Peterborough, ON | 2007

OTHER

Ashburnham Ale House Restaurant
Peterborough, ON | 2012

Barrie Main Branch Library Renovations
Barrie, ON, $300k | 2011

City of Peterborough Welcome/Interpretation Centre
Feasibility Study, Peterborough, ON | 2001

Riverview Park and Zoo Otter Exhibit
Peterborough, ON | $800k | 2005